And we are glad to present a new project in the Gazipasa area again:
1+1 apartments and penthouses in a cozy residential complex with infrastructure at the start of construction in a picturesque and peaceful area.
The complex with a total area of 3,041.93 m2 consists of one 7-storey block in a fenced area. A large territory, modern architecture and design, all the infrastructure necessary for living and spending a vacation, walking distance to sandy beaches and all social facilities of the resort – the oriental bazaar, chain stores, a promenade, a pharmacy, a public transport stop. Convenient transport accessibility and proximity to the international airport. An excellent investment option at the start of construction in a rapidly developing area.
• Gazipasa Airport is 4 km away
• to the sea – 1700 m
• Gazipasa city center is 1.3 km away
• the center of Alanya is 45 km away
• to the store/restaurant – 350 m
• Construction starts in December 2022.
• completion of construction – March 2024.
Types of apartments, number and area:
• 1+1 apartments – 48 pcs. (from 52 m2 to 60 m2)
• 2+1 two–level – 6 pcs. (from 100 m2 to 106 m2)
• 3+1 duplex – 2 pcs. (140 m2)
• the total number of apartments is 56 units.
Characteristics of apartments:
• steel entrance door
• video intercom
• double glazing on the windows
• balcony
• interior doors
• Built-in wardrobe
• built-in kitchen set with granite work surface
• equipped bathroom (shower cabin, plumbing, built-in furniture, wall mirror)
• Basic and decorative lighting
• washable paint on the walls
• floor covering – ceramic tiles
• sockets and switches
• TV cable
• wiring for the air conditioner
The infrastructure of the complex:
• outdoor pool with water slides
• children’s pool
• pool shower
• sunbathing area
• sauna
• Gym
• children’s playroom
• Lobby
• 2 elevators
• fire escape
• children’s playground
• gazebo for relaxation
• barbecue area
• landscaped garden
• Satellite TV
• Outdoor parking
• the caretaker
• Electric power generator
• fenced area
initial payment – 35% of the cost
the remaining cost is provided by an interest-free installment plan in accordance with the payment schedule until 12.2024.